References

Chemical Projects

 

Start
End

Client
Country

Subject

Scope of Work

Number of Pieces
Size
Pressure
Temperature

5/2001
7/2001

KOVOPROJEKTA a.s.,
Brno
Czech Republic

Process units 3420, 3430, 3620 safety upgrade

Detail design

1 unit
Equipment upgrade

10/2001
11/2001

BORSODCHEM MCHZ s.r.o.
Ostrava - Mariánské Hory
Czech Republic

Design study of absorption part of technical acid production

Design study

1 line
220 t/day nitric acid

11/2001
06/2002

UNIPROGRAM Praha s.r.o.
Praha
Czech Republic

Tube bundles of furnace E 108

Detail design, equipment delivery

2 pcs
Heat transfer surface
1 x 320 m2;
1 x 485 m2
12.0 MPa
410°C

12/2001
08/2002

UNIPROGRAM Praha s.r.o.
Praha
Czech Republic

Tube bundles of furnace E 111

Detail design, equipment delivery

1 pc
D 1560 x H 8000 mm
11.8 MPa
540°C

3/2002
1/2003

LUKOIL NEFTOCHIM, Bourgas,
Bulgaria

UOP Process reactor and pressure vessels

Detail design, equipment delivery

5 pcs
reactor
D 2840 x H 21720 mm, 130 t
Other vessels
Up D 2400 x H 9200 mm
1.7 MPa
550°C

04/2002
12/2002

BorsodChem - MCHZ s.r.o.
Ostrava - Mariánské Hory
Czech Republic

Intensification of absorption column C-3070

Basic design, detail design, equipment delivery, erection, commissioning

1 line
220 t/day nitric acid
D 3180 x H 31500 mm
0.38 MPa
100 °C

5/2002
3/2003

SIIRTEC NIGI,
Itálie

Sulphur recovery unit

Equipment delivery

1 unit

7/2002
3/2003

MAŽEIKIU NAFTA,
Litva

Column K-302

Equipment delivery

1 pc

D 1800 x H 18450 mm
6,4 MPa

07/2002
06/2003

AZOT
Severodonětsk
Ukraine

Stripper of urea production

Detail design, equipment delivery

1 pc
Urea 1000 t/day urea
D 2200 x 11700 mm
16 MPa
225°C

02/2004
10/2004

PRECHEZA PŘEROV a.s.
Přerov
Czech Republic

Repair of heat exchanger
14-912

Detail design, equipment delivery, erection

1 pc
D 2600 x H 10730 mm
1 bar
Contact gas 430°C

02/2004
5/2005

HALDOR TOPSØE A/S
Denmark

Equipment for hydrogen production

Detail design, equipment delivery, erection, commissioning

1 line
6000 m3n/h H2
3.1 MPa
650°C

5/2005
9/2005

BC-MCHZ,
Ostrava,
Czech Republic

Process column re-qualification in pressure column

Detail design

1 unit
D 600 x 10800 mm
0,19 MPa
200°C

11/2005 10/2006

HALDOR TOPSOE A/S,
Denmark

Hydrogen production unit

Detail design, equipment delivery, erection, commissioning

1 unit
5 000 Nm3/hod
3,1 MPa
650°C

3/2006
8/2007

SPOLANA a.s.,
Neratovice,
Czech Republic

Sulphur acid final absorption tower (MECS process)

Basic design, detail design, equipment delivery, erection, commissioning

1 unit
500 t/day sulphur acid
D 3000 x 10500 mm,
0.11 MPa
172°C

5/2006 10/2006

SPOLANA a.s.,
Neratovice,
Czech Republic

DT 1403 A/B demonomere column efficiency increase

Detail design, equipment delivery, erection

2 unit
D 1600,
6 pcs trays added
0,8 MPa
150°C

6/2006
7/2006

BC-MCHZ,
Ostrava,
Czech Republic

Hydrogen production unit catalysts replacement

Detail design, replacement

1 unit
6 000 Nm3/hod

6/2006 11/2006

SPOLANA a.s.,
Neratovice,
Czech Republic

Polymer reactors process component dosing equipment

Detail design, building approval design

2 lines
14 reactors

1,6 MPa
180°C

6/2006 10/2006

SYNTHESIA a.s.,
Pardubice,
Czech Republic

Acid plant stack reconstruction

Detail design

1 unit
D 800 x H 30 000 mm

0.1 MPa
200°C

10/2006 12/2006

SPOLANA a.s.,
Neratovice,
Czech Republic

Polymer reactors de-foaming oil dosing equipment

Detail design, equipment delivery, erection, commissioning

2 lines
14 reactors

1,6 MPa
180°C

9/2006 3/2007

KOVOPROJEKTA a.s.
Brno
Czech Republic

Treating of sulphur emissions from selected process units

Detail design

9 process units
3.0 MPa
300°C

3/2007
4/2008

SPOLANA a.s.
Neratovice
Czech Republic

Modification of Waste water dechlorination

Detail design, equipment delivery, installation, commissioning

1 line
15 m3/h chlorine water
0.6 MPa
90°C

4/2007 12/2007

SPOLANA a.s.
Neratovice
Czech Republic

Retrofit of lye liquor collector TK 201

Detail design, equipment delivery, installation, commissioning

1 pc
D1600 x L 6500 mm
0.1 MPa
120°C

6/2007 8/2007

KOVOPROJEKTA a.s.
Brno
Czech Republic

Amine unit pipelines

Detail design

1 pc
1.5 MPa
170°C

5/2007 6/2007

SPOLANA a.s.
Neratovice
Czech Republic

Dosing of antioxidants and impregnates into the polymer reactors

Detail design, design for building approval

2 lines
14 reactors
1.6 MPa
180°C

1/2008 10/2010

SPOLANA a.s.
Neratovice
Czech Republic

Retrofit of SO2 production - line No. 2 

Basic design, design for building approval, detail design, equipment delivery, installation, commissioning

1 line
Combustion chamber 5.1 t/h of sulphur,
Fire tube boiler 18.5t/h,
Boiler DUMAG 500 Nm3/h natural gas
Boiler steam 215°C, 25 bar
ČSN

2/2008 3/2008

VIAMONT a.s.,
Ústí nad Labem,
Czech Republic

Removal of ion bisphenol production bottle necks - Phenol water extraction unit

Basic design

1 line
Capacity 680 kg/h of phenol waters (1 rotary disc extractor)

6/2008 8/2009

HALDOR TOPSOE A/S, Denmark

Hydrogen production unit

Detail design, equipment delivery, skid mounting erection

1 line
30 000 Nm3/h
ASME

5/2009 6/2009

SYNTHESIA a.s.,
Pardubice
Czech Republic

Detail design of column repair

Detail design

1 set
column D 3200, H = 32 500 mm, material 17246
4 bar 200°C
CSN

6/2010
7/2010

SPOLANA a.s.,
Neratovice,
Czech Republic

Retrofit of polymerization unit - I. stage

Basic design

24 000 kg PVC
Reactor 80 m3,
D 3980 x H 7400 mm
mat. SS
1,1 MPa, 80°C
CSN

8/2010
9/2011

SYNTHESIA a.s.,
Pardubice,
Czech Republic

Nitric acid production convertor with boiler

Detail design,
equipment delivery,
erection and instalation commissioning

33 600 Nm3/h nitric gases
14 t/h steam
convertor 0,25 MPa, 850°C,
boiler 3,7 MPa,
heater 4,0 Mpa, 460°C

8/2010
8/2011

LOVOCHEMIE a.s., Lovosice,
Czech Republic

Nitric acid production convertor with boiler

Detail design,
equipment delivery,
erection and instalation commissioning

36 000 Nm3/h nitric gases
16 t/h steam
convertor 0,25 MPa, 850°C,
boiler 3,7 MPa,
heater 4,0 Mpa, 460°C

12/2010
12/2011

HALDOR TOPSOE A/S, Denmark

Hydrogen production unit

Detail design, equipment delivery, skid mounting erection

1 line
26 000 Nm3/h
ASME

12/2011
1/2013

HALDOR TOPSOE A/S, Denmark

Hydrogen production unit

Detail design, equipment delivery, skid mounting erection

1 line
30 000 Nm3/h
ASME

8/2012
8/2013

BC-MCHZ, Ostrava, Czech Republic

Nitric Acid Plant Convertor Boiler

Detail design,
equipment delivery,
erection and instalation commissioning

1 set 33 600 Nm3/h of nitrous gas, overheated steam production 11 t/hod Convertor D4200 x H5700, boiler D2300 x H 4200, steam overheater D2100 x H500 SS, CS convertor 0,4 MPa; boiler 4,3 MPa,overheater 4,0 MPa convertor 880°C, overheater 460°C ČSN EN

5/2013
7/2013

LZ Draslovka, a.s., Kolín, Czech Republic

Cyanide finalization line

Detail Design documentation incl. Civil permit docs., technical supervision

1 set, 40t/day

1/2014
2/2014

LZ Draslovka, a.s., Kolín, Czech Republic

Ammonia Absorber

Tender contractual documentation for replacement of Ammonia Absorber

1 set, flow 19500 m3/h, D1800xL19000, 1.4571, 0,7bar, 200°C, ČSN + PED

12/2013 2/2015

PARAMO a.s., Pardubice, Czech Republic

Replacement of solvent cresol for NMP

Implementation documentation, equipment delivery & erection & commissioning

1 set 4000kg/h of VGO; equipment set; CS; 0,25bar(a) 200°C; ČSN

07/2014 12/2014

DUSLO a.s., Šala, Slovakia

New N30A/B Waste heat boiler coil internals

Thermal & strength calculation, design documentation, documentation delivery

2 sets 820t/d HNO3, 19t/h superheated steam; Evaporator D3200 x H 2000; Steam superheater D3200 x H500; CS, SS, Incoloy;
Evaporator 4,1MPa(a); Steam superheater 3,87MPa(a) Evaporator 250°C; steam superheater 430°C; ČSN EN

11/2014 06/2015

KOVOPROJEKTA a.s., Brno, Czech Republic

ACRYLONITRILE PLANT EXPANSION - piping design

Implementation documentation, documentation delivery

1 set; up to DN400, CS, SS, up to 44 bar, up to 550°C, ASME Code

12/2014
09/2015

SYNTHESIA a.s., Pardubice, Czech Republic

Equipment for nitrocellulose cutting

Implementation documentation, equipment delivery & erection & commissioning

1 set; Cutting of 800 - 1000 kg produced highly viscous nitrocellulose to pulpation value lying in the interval (80-90) ml / 10 g of dry nitrocellulose during cutting in 12 hours; 6300x4000 mm; CS; atm; ambient; ČSN

01/2015 07/2015

CS CABOT s.r.o., Val-Mez, Czech Republic

APH installation

Implementation documentation, equipment delivery & erection & commissioning

1 set Flue gas 37 000Nm3/h, 940°C; combustion air 18 000Nm3/h, 900°C; equipment set ;SS+CS; 0,55bar; 940°C ; ČSN EN

3/2015
06/2016

VUANCH a.s., Ústí n.L., Czech Republic

Experimental units for the project UniCRE

Implementation documentation, equipment delivery & erection & commissioning

9 sets; SS; up to 30MPa; up to 550°C; ČSN EN

10/2015 7/2016

DUSLO a.s., Šaľa, Slovakia

New N30A/B nitric acid boiler tube internals , 1Pc Economiser N11

Strength calculation and design documentation, equipment delivery & erection & commissioning

2 sets; 820t/d HNO3, 19t/h superheated steam Evaporator D3200 x H 2000, Steam superheater D3200 x H500, Economiser D3400xH5300 CS, SS, Incoloy Evaporator 4,1MPa(a), Superheater 3,87MPa(a); Ekonomizer 4,8MPa(a) Evaporator 250°C; Steam superheater 430°C; Ekonomiser 350°C ČSN EN

11/2015 09/2016

LOVOCHEMIE a.s., Lovosice, Czech Republic

Denitration column on nitric acid production line KD5

Basic & Detail design documentation, equipment delivery & erection & commissioning

1 set, Air with NOx 8500Nm3/h, nitric acid 22,4t/h, D1000 x H 51000, SS, 4 bar,100°C, ČSN EN

1/2017 8/2017

EXPLOSIA a.s., Pardubice, Czech Rep.

Building B315 gunpowder production technology modifycation

Detail Design documentation, equipment delivery & erection & commissioning

1 set   SS atm. 20°C ČSN

5/2017 12/2018

SYNTHESIA a.s., Pardubice, Czech Rep.

Nitrocellulose grinders reconstruction

Implementation documentation, equipment delivery & erection & commissioning

3 sets  CS, SS atm. 20°C ČSN

07/2016 12/2017

LZ Draslovka a.s., Kolín, Czech Rep.

Reactor and waste heat boiler in HCN production line

Detail Design documentation incl. Civil permit docs., equipment delivery & erection & commissioning

1 set 16 750 kg/h of process gas, 9650kg/h of steam LaMont 56m2, boiler 219m2, Economiser 133m2heat exchange surface CS, Cr-Ni 12 bar 1070°C ČSN

10/2016 8/2017

BC-MCHZ s.r.o., Ostrava, Czech Rep.

Vertical flue gas duct convection section heaters E201, E202 and E204-2 in Hydrogen production plant 1

Implementation documentation, equipment delivery & erection & commissioning

1 set  E201+202: Process gas heating and steam production, E204-2 NG heating  E201+202: 15+50m2, tube coils in common refractory lined module, E204-2: tube coils in refractory lined module Cr-Ni, CS up to 38 bar do 715°C ČSN EN

12/2016 2/2017

BIURO PROJEKTOW KOKSOPROJEKT Zabrze, Poland

Project Heat exchangers in Benzene plant of cookery chemical section

Civil Permit documentation, documentation delivery

1 set ,ČSN

1/2017 8/2017

EXPLOSIA a.s., Pardubice, Czech Rep.

Building B315 gunpowder production technology modification

Detail Design documentation, equipment delivery & erection & commissioning

1 set, mat. SS atm. 20°C ČSN

5/2017 12/2018

SYNTHESIA a.s., Pardubice, Czech Rep.

Nitrocellulose grinders reconstruction

Implementation documentation, equipment delivery & erection & commissioning

1 set, mat. CS, SS atm. 20°C ČSN

6/2017 8/2018

BC-MCHZ s.r.o., Ostrava, Czech Rep.

Horizontal flue gas duct convection section heaters E203, E204-1 ang waste heat boiler E206 in Hydrogen production plant 1

Implementation documentation, equipment delivery & erection & commissioning

1 set E206: 124m2, D1100 - L11500 mm, 13,5t, inlet chamber refractory lining; E203 1&2: 355m2, 3x3,5x7,8m , 21 t, shell refractory lining; E204-1: 80m2, 1,5x3,5x7,8m, 10t, shell refractory lining  CS, SS 39 bar 310°C EN

9/2017 3/2018

LZ Draslovka a.s., Kolín, Czech Rep.

HCN Condenser E116D in  HCN production line

Detail Design documentation, equipment delivery & erection & commissioning

1 set 0,34MW, 73m2 DN650-L3100mm SS 5bar 20°C ČSN EN

9/2017 3/2018

LZ Draslovka a.s., Kolín, Czech Rep.

Condenser E112/2,3 in  HCN production line

Detail Design documentation, equipment delivery & erection & commissioning

1 set 2x85 m2 of heat exchange surface, process water flow 65m3/h 2x D600 x L4000 SS 5bar 50°C ČSN EN

9/2017 3/2018

LZ Draslovka a.s., Kolín, Czech Rep.

Condenser E113/3,4 in  HCN production line

Detail Design documentation, equipment delivery & erection & commissioning

1 set E113: 1,43MW, 206m2 E113: DN650-L4250mm, SS 5 bar 80°C ČSN EN

1/2018 2/2018

PREST Přerov a.s., Czech Rep.

Reactor 6504E detail design documentation

Strength calculation and design documentation, documentation delivery

1 set 167 m3 D4300 - L11500 mm CS 2,22 bar 125°C ČSN

1/2018 2/2018

LZ Draslovka a.s., Kolín, Czech Rep.

Civil permit documentationfor the project HCN production line II modernization

Civil Permit documentation, documentation delivery

1 set   SS 1 bar 200°C ČSN

2/2018 3/2018

LOVOCHEMIE a.s., Lovosice, Czech Rep.

FEM analysis and  screen support system detail design documentation amendment in nitrid acid production line reactor

Strength calculation and design documentation, documentation delivery

1 set, mat. SS, pressure atm. 1150°C ČSN

3/2018 5/2018

HUTNÍ PROJEKT Frýdek Místek a.s., Frýdek-Místek, Czech Rep.

Ammonium sulfate saturator reconstruction on COG treatment plant

Implementation documentation, documentation delivery

1 set,  54100 m3/h COG D6000xH9700mm, mat. SS, pressure hydrostatic 60°C ČSN EN

5/2018 7/2018

EVECO Brno, s.r.o., Brno, Czech Rep.

Project : Sludge Incienerator Reconstruction - SIR, Flue fas Heater thermal & strenght calculation, detail desing

Thermal & strength calculation, design documentation, documentation delivery

1 set flue gas 14 800 Nm3/h 11285x1680x2000 mm CS flue gas 1bar, termooil 6bar flue gas in/out 900/230°C ČSN EN

8/2018 11/2018

Lovochemie, a.s.,  Lovosice, Czech Rep.

Project "Intensification of nitric acid production on KD6", "Preparation of project implementation documentation for civil, technological equipment and E&I&A part

Detail Design documentation, documentation delivery

1 set Capacity enhancement from 900 to 1100t KD/day. Nitric Acid concentration min. 60 % weight
 set of various eguipment SS 400kPa 50°C ČSN EN

10/2018 3/2018

Biuro Projektów KOKSOPROJEKT Sp. z o.o., Zabrze, Polsko, Poland

Wash Oil Regenerator, WO separator - Steel Structure Design documentation

Strength calculation and design documentation, equipment delivery

1 set      0

10/2018 12/2018

EVECO Brno, s.r.o., Brno, Czech Rep.

Flue gas exchanger bundles - FEM analysis and detail design dokumentation

Strength calculation, FEM analysis, design documentation, documentation delivery

1 set á 72m2 heat exchange surface 1065x2800x1640mm CS 10bar 300°C ČSN EN

11/2018 12/2018

Lučební závody Draslovka a.s. Kolín, Kolín, Czech Rep.

 Project „ HCN II Production Modernization“As-built documentation

Detail Design documentation, documentation delivery

1 set      0

12/2018 3/2019

Lovochemie, a.s.,  Lovosice, Czech Rep.

Reactor SA R6110 on BDASA production line detail design documentation incl. strength calcualtion

Strength calculation, FEM analysis, design documentation, documentation delivery

1 set 1100m3/h of slurry DASA: 45,6 % weight, Amonia sulfate 38,2% weight, Ammonium nitrate 10,5 %weight, water 5,7 %weight,  Al2O3+Al(OH)3 Body DN 5000mm, rizers DN 1200 and 800mm, assembly height 23,4 m SS 3bar 200°C ČSN EN

12/2018 3/2020

HALDOR TOPSØE A/S, Lyngby, Dánsko, Denmark

Hydrogen Production Line 30.000 Nm3/h, LLC Novatek Ust-Luga Refinery, Russia

Detail Design documentation, equipment delivery & erection & commissioning

1 set Hydrogen 30.000 Nm3/h,  set of various eguipment CS, Cr-Mo, Cr-Ni 3,1 MPa 650°C ASME

4/2019 12/2021

BorsodChem MCHZ, s.r.o., Ostrava - Mariánské Hory, Czech Rep.

Benzene Adiabatic nitration line S/001/15

Detail Design documentation, equipment delivery & erection & commissioning

1 set 120 000 metrických tun MNB Operation unit overal dimensions 36x30x35m CS, SS   ČSN EN

8/2019 12/2019

Unipetrol výzkumně vzdělávací centrum, a.s., UniCRE, Ústí nad Labem, Czech Rep.

Hydrocracking test unit

Implementation documentation, equipment delivery & erection & commissioning

1 set Simulation of a two-stage hydrocracking process and research into the influence of conditions, raw materials and catalyst activity, etc. on the hydrocracking process. The experiments will take place in the short and long term, including long-term testing in the order of approximately weeks to 6-12 months. 3000x2000x4500 mm SS 30 Mpa 500°C ČSN EN

3/2020 3/2021

Synthesia, a.s. Semtín, Pardubice, Czech Rep.

Modernization of the denitration column

Detail Design documentation, equipment delivery & erection & commissioning

1 set Nitric acid flow: 13 500 - 15 500 l/h  DN1000x5400 mm SS 300kPa 80°C ČSN+PED

1/2021 10/2021

Synthesia, a.s. Semtín, Pardubice, Czech Rep.

Modernization of the denitration columnOxidizer-Condenser Vessel

Detail Design documentation, equipment delivery & erection & commissioning

1 set, mat. SS, ČSN EN