Chemical Projects
Start |
Client |
Subject |
Scope of Work |
Number of Pieces |
|||
---|---|---|---|---|---|---|---|
5/2001 |
KOVOPROJEKTA a.s., |
Process units 3420, 3430, 3620 safety upgrade |
Detail design |
1 unit |
|||
10/2001 |
BORSODCHEM MCHZ s.r.o. |
Design study of absorption part of technical acid production |
Design study |
1 line |
|||
11/2001 |
UNIPROGRAM Praha s.r.o. |
Tube bundles of furnace E 108 |
Detail design, equipment delivery |
2 pcs |
|||
12/2001 |
UNIPROGRAM Praha s.r.o. |
Tube bundles of furnace E 111 |
Detail design, equipment delivery |
1 pc |
|||
3/2002 |
LUKOIL NEFTOCHIM, Bourgas, |
UOP Process reactor and pressure vessels |
Detail design, equipment delivery |
5 pcs |
|||
04/2002 |
BorsodChem - MCHZ s.r.o. |
Intensification of absorption column C-3070 |
Basic design, detail design, equipment delivery, erection, commissioning |
1 line |
|||
5/2002 |
SIIRTEC NIGI, |
Sulphur recovery unit |
Equipment delivery |
1 unit |
|||
7/2002 |
MAŽEIKIU NAFTA, |
Column K-302 |
Equipment delivery |
1 pc D 1800 x H 18450 mm |
|||
07/2002 |
AZOT |
Stripper of urea production |
Detail design, equipment delivery |
1 pc |
|||
02/2004 |
PRECHEZA PŘEROV a.s. |
Repair of heat exchanger |
Detail design, equipment delivery, erection |
1 pc |
|||
02/2004 |
HALDOR TOPSØE A/S |
Equipment for hydrogen production |
Detail design, equipment delivery, erection, commissioning |
1 line |
|||
5/2005 |
BC-MCHZ, |
Process column re-qualification in pressure column |
Detail design |
1 unit |
|||
11/2005 10/2006 |
HALDOR TOPSOE A/S, |
Hydrogen production unit |
Detail design, equipment delivery, erection, commissioning |
1 unit |
|||
3/2006 |
SPOLANA a.s., |
Sulphur acid final absorption tower (MECS process) |
Basic design, detail design, equipment delivery, erection, commissioning |
1 unit |
|||
5/2006 10/2006 |
SPOLANA a.s., |
DT 1403 A/B demonomere column efficiency increase |
Detail design, equipment delivery, erection |
2 unit |
|||
6/2006 |
BC-MCHZ, |
Hydrogen production unit catalysts replacement |
Detail design, replacement |
1 unit |
|||
6/2006 11/2006 |
SPOLANA a.s., |
Polymer reactors process component dosing equipment |
Detail design, building approval design |
2 lines 1,6 MPa |
|||
6/2006 10/2006 |
SYNTHESIA a.s., |
Acid plant stack reconstruction |
Detail design |
1 unit 0.1 MPa |
|||
10/2006 12/2006 |
SPOLANA a.s., |
Polymer reactors de-foaming oil dosing equipment |
Detail design, equipment delivery, erection, commissioning |
2 lines 1,6 MPa |
|||
9/2006 3/2007 |
KOVOPROJEKTA a.s. |
Treating of sulphur emissions from selected process units |
Detail design |
9 process units |
|||
3/2007 |
SPOLANA a.s. |
Modification of Waste water dechlorination |
Detail design, equipment delivery, installation, commissioning |
1 line |
|||
4/2007 12/2007 |
SPOLANA a.s. |
Retrofit of lye liquor collector TK 201 |
Detail design, equipment delivery, installation, commissioning |
1 pc |
|||
6/2007 8/2007 |
KOVOPROJEKTA a.s. |
Amine unit pipelines |
Detail design |
1 pc |
|||
5/2007 6/2007 |
SPOLANA a.s. |
Dosing of antioxidants and impregnates into the polymer reactors |
Detail design, design for building approval |
2 lines |
|||
1/2008 10/2010 |
SPOLANA a.s. |
Retrofit of SO2 production - line No. 2 |
Basic design, design for building approval, detail design, equipment delivery, installation, commissioning |
1 line |
|||
2/2008 3/2008 |
VIAMONT a.s., |
Removal of ion bisphenol production bottle necks - Phenol water extraction unit |
Basic design |
1 line |
|||
6/2008 8/2009 |
HALDOR TOPSOE A/S, Denmark |
Hydrogen production unit |
Detail design, equipment delivery, skid mounting erection |
1 line |
|||
5/2009 6/2009 |
SYNTHESIA a.s., |
Detail design of column repair |
Detail design |
1 set |
|||
6/2010 |
SPOLANA a.s., |
Retrofit of polymerization unit - I. stage |
Basic design |
24 000 kg PVC |
|||
8/2010 |
SYNTHESIA a.s., |
Nitric acid production convertor with boiler |
Detail design, |
33 600 Nm3/h nitric gases |
|||
8/2010 |
LOVOCHEMIE a.s., Lovosice, |
Nitric acid production convertor with boiler |
Detail design, |
36 000 Nm3/h nitric gases |
|||
12/2010 |
HALDOR TOPSOE A/S, Denmark |
Hydrogen production unit |
Detail design, equipment delivery, skid mounting erection |
1 line |
|||
12/2011 |
HALDOR TOPSOE A/S, Denmark |
Hydrogen production unit |
Detail design, equipment delivery, skid mounting erection |
1 line |
|||
8/2012 |
BC-MCHZ, Ostrava, Czech Republic |
Nitric Acid Plant Convertor Boiler |
Detail design, |
1 set 33 600 Nm3/h of nitrous gas, overheated steam production 11 t/hod Convertor D4200 x H5700, boiler D2300 x H 4200, steam overheater D2100 x H500 SS, CS convertor 0,4 MPa; boiler 4,3 MPa,overheater 4,0 MPa convertor 880°C, overheater 460°C ČSN EN |
|||
5/2013 |
LZ Draslovka, a.s., Kolín, Czech Republic |
Cyanide finalization line |
Detail Design documentation incl. Civil permit docs., technical supervision |
1 set, 40t/day |
|||
1/2014 |
LZ Draslovka, a.s., Kolín, Czech Republic |
Ammonia Absorber |
Tender contractual documentation for replacement of Ammonia Absorber |
1 set, flow 19500 m3/h, D1800xL19000, 1.4571, 0,7bar, 200°C, ČSN + PED |
|||
12/2013 2/2015 |
PARAMO a.s., Pardubice, Czech Republic |
Replacement of solvent cresol for NMP |
Implementation documentation, equipment delivery & erection & commissioning |
1 set 4000kg/h of VGO; equipment set; CS; 0,25bar(a) 200°C; ČSN |
|||
07/2014 12/2014 |
DUSLO a.s., Šala, Slovakia |
New N30A/B Waste heat boiler coil internals |
Thermal & strength calculation, design documentation, documentation delivery |
2 sets 820t/d HNO3, 19t/h superheated steam; Evaporator D3200 x H 2000; Steam superheater D3200 x H500; CS, SS, Incoloy; |
|||
11/2014 06/2015 |
KOVOPROJEKTA a.s., Brno, Czech Republic |
ACRYLONITRILE PLANT EXPANSION - piping design |
Implementation documentation, documentation delivery |
1 set; up to DN400, CS, SS, up to 44 bar, up to 550°C, ASME Code |
|||
12/2014 |
SYNTHESIA a.s., Pardubice, Czech Republic |
Equipment for nitrocellulose cutting |
Implementation documentation, equipment delivery & erection & commissioning |
1 set; Cutting of 800 - 1000 kg produced highly viscous nitrocellulose to pulpation value lying in the interval (80-90) ml / 10 g of dry nitrocellulose during cutting in 12 hours; 6300x4000 mm; CS; atm; ambient; ČSN |
|||
01/2015 07/2015 |
CS CABOT s.r.o., Val-Mez, Czech Republic |
APH installation |
Implementation documentation, equipment delivery & erection & commissioning |
1 set Flue gas 37 000Nm3/h, 940°C; combustion air 18 000Nm3/h, 900°C; equipment set ;SS+CS; 0,55bar; 940°C ; ČSN EN |
|||
3/2015 |
VUANCH a.s., Ústí n.L., Czech Republic |
Experimental units for the project UniCRE |
Implementation documentation, equipment delivery & erection & commissioning |
9 sets; SS; up to 30MPa; up to 550°C; ČSN EN |
|||
10/2015 7/2016 |
DUSLO a.s., Šaľa, Slovakia |
New N30A/B nitric acid boiler tube internals , 1Pc Economiser N11 |
Strength calculation and design documentation, equipment delivery & erection & commissioning |
2 sets; 820t/d HNO3, 19t/h superheated steam Evaporator D3200 x H 2000, Steam superheater D3200 x H500, Economiser D3400xH5300 CS, SS, Incoloy Evaporator 4,1MPa(a), Superheater 3,87MPa(a); Ekonomizer 4,8MPa(a) Evaporator 250°C; Steam superheater 430°C; Ekonomiser 350°C ČSN EN |
|||
11/2015 09/2016 |
LOVOCHEMIE a.s., Lovosice, Czech Republic |
Denitration column on nitric acid production line KD5 |
Basic & Detail design documentation, equipment delivery & erection & commissioning |
1 set, Air with NOx 8500Nm3/h, nitric acid 22,4t/h, D1000 x H 51000, SS, 4 bar,100°C, ČSN EN |
|||
1/2017 8/2017 |
|
|
|
1 set SS atm. 20°C ČSN |
|||
5/2017 12/2018 |
|
|
Implementation documentation, equipment delivery & erection & commissioning |
3 sets CS, SS atm. 20°C ČSN |
|||
07/2016 12/2017 |
LZ Draslovka a.s., Kolín, Czech Rep. |
Reactor and waste heat boiler in HCN production line |
Detail Design documentation incl. Civil permit docs., equipment delivery & erection & commissioning |
1 set 16 750 kg/h of process gas, 9650kg/h of steam LaMont 56m2, boiler 219m2, Economiser 133m2heat exchange surface CS, Cr-Ni 12 bar 1070°C ČSN |
|||
10/2016 8/2017 |
BC-MCHZ s.r.o., Ostrava, Czech Rep. |
Vertical flue gas duct convection section heaters E201, E202 and E204-2 in Hydrogen production plant 1 |
Implementation documentation, equipment delivery & erection & commissioning |
1 set E201+202: Process gas heating and steam production, E204-2 NG heating E201+202: 15+50m2, tube coils in common refractory lined module, E204-2: tube coils in refractory lined module Cr-Ni, CS up to 38 bar do 715°C ČSN EN |
|||
12/2016 2/2017 |
BIURO PROJEKTOW KOKSOPROJEKT Zabrze, Poland |
Project Heat exchangers in Benzene plant of cookery chemical section |
Civil Permit documentation, documentation delivery |
1 set ,ČSN |
|||
1/2017 8/2017 |
EXPLOSIA a.s., Pardubice, Czech Rep. |
Building B315 gunpowder production technology modification |
Detail Design documentation, equipment delivery & erection & commissioning |
1 set, mat. SS atm. 20°C ČSN |
|||
5/2017 12/2018 |
SYNTHESIA a.s., Pardubice, Czech Rep. |
Nitrocellulose grinders reconstruction |
Implementation documentation, equipment delivery & erection & commissioning |
1 set, mat. CS, SS atm. 20°C ČSN |
|||
6/2017 8/2018 |
BC-MCHZ s.r.o., Ostrava, Czech Rep. |
Horizontal flue gas duct convection section heaters E203, E204-1 ang waste heat boiler E206 in Hydrogen production plant 1 |
Implementation documentation, equipment delivery & erection & commissioning |
1 set E206: 124m2, D1100 - L11500 mm, 13,5t, inlet chamber refractory lining; E203 1&2: 355m2, 3x3,5x7,8m , 21 t, shell refractory lining; E204-1: 80m2, 1,5x3,5x7,8m, 10t, shell refractory lining CS, SS 39 bar 310°C EN |
|||
9/2017 3/2018 |
LZ Draslovka a.s., Kolín, Czech Rep. |
HCN Condenser E116D in HCN production line |
Detail Design documentation, equipment delivery & erection & commissioning |
1 set 0,34MW, 73m2 DN650-L3100mm SS 5bar 20°C ČSN EN |
|||
9/2017 3/2018 |
LZ Draslovka a.s., Kolín, Czech Rep. |
Condenser E112/2,3 in HCN production line |
Detail Design documentation, equipment delivery & erection & commissioning |
1 set 2x85 m2 of heat exchange surface, process water flow 65m3/h 2x D600 x L4000 SS 5bar 50°C ČSN EN |
|||
9/2017 3/2018 |
LZ Draslovka a.s., Kolín, Czech Rep. |
Condenser E113/3,4 in HCN production line |
Detail Design documentation, equipment delivery & erection & commissioning |
1 set E113: 1,43MW, 206m2 E113: DN650-L4250mm, SS 5 bar 80°C ČSN EN |
|||
1/2018 2/2018 |
PREST Přerov a.s., Czech Rep. |
Reactor 6504E detail design documentation |
Strength calculation and design documentation, documentation delivery |
1 set 167 m3 D4300 - L11500 mm CS 2,22 bar 125°C ČSN |
|||
1/2018 2/2018 |
LZ Draslovka a.s., Kolín, Czech Rep. |
Civil permit documentationfor the project HCN production line II modernization |
Civil Permit documentation, documentation delivery |
1 set SS 1 bar 200°C ČSN |
|||
2/2018 3/2018 |
LOVOCHEMIE a.s., Lovosice, Czech Rep. |
FEM analysis and screen support system detail design documentation amendment in nitrid acid production line reactor |
Strength calculation and design documentation, documentation delivery |
1 set, mat. SS, pressure atm. 1150°C ČSN |
|||
3/2018 5/2018 |
HUTNÍ PROJEKT Frýdek Místek a.s., Frýdek-Místek, Czech Rep. |
Ammonium sulfate saturator reconstruction on COG treatment plant |
Implementation documentation, documentation delivery |
1 set, 54100 m3/h COG D6000xH9700mm, mat. SS, pressure hydrostatic 60°C ČSN EN |
|||
5/2018 7/2018 |
EVECO Brno, s.r.o., Brno, Czech Rep. |
Project : Sludge Incienerator Reconstruction - SIR, Flue fas Heater thermal & strenght calculation, detail desing |
Thermal & strength calculation, design documentation, documentation delivery |
1 set flue gas 14 800 Nm3/h 11285x1680x2000 mm CS flue gas 1bar, termooil 6bar flue gas in/out 900/230°C ČSN EN |
|||
8/2018 11/2018 |
Lovochemie, a.s., Lovosice, Czech Rep. |
Project "Intensification of nitric acid production on KD6", "Preparation of project implementation documentation for civil, technological equipment and E&I&A part |
Detail Design documentation, documentation delivery |
1 set Capacity enhancement from 900 to 1100t KD/day. Nitric Acid concentration min. 60 % weight |
|||
10/2018 3/2018 |
Biuro Projektów KOKSOPROJEKT Sp. z o.o., Zabrze, Polsko, Poland |
Wash Oil Regenerator, WO separator - Steel Structure Design documentation |
Strength calculation and design documentation, equipment delivery |
1 set 0 |
|||
10/2018 12/2018 |
EVECO Brno, s.r.o., Brno, Czech Rep. |
Flue gas exchanger bundles - FEM analysis and detail design dokumentation |
Strength calculation, FEM analysis, design documentation, documentation delivery |
1 set á 72m2 heat exchange surface 1065x2800x1640mm CS 10bar 300°C ČSN EN |
|||
11/2018 12/2018 |
Lučební závody Draslovka a.s. Kolín, Kolín, Czech Rep. |
Project „ HCN II Production Modernization“As-built documentation |
Detail Design documentation, documentation delivery |
1 set 0 |
|||
12/2018 3/2019 |
Lovochemie, a.s., Lovosice, Czech Rep. |
Reactor SA R6110 on BDASA production line detail design documentation incl. strength calcualtion |
Strength calculation, FEM analysis, design documentation, documentation delivery |
1 set 1100m3/h of slurry DASA: 45,6 % weight, Amonia sulfate 38,2% weight, Ammonium nitrate 10,5 %weight, water 5,7 %weight, Al2O3+Al(OH)3 Body DN 5000mm, rizers DN 1200 and 800mm, assembly height 23,4 m SS 3bar 200°C ČSN EN |
|||
12/2018 3/2020 |
HALDOR TOPSØE A/S, Lyngby, Dánsko, Denmark |
Hydrogen Production Line 30.000 Nm3/h, LLC Novatek Ust-Luga Refinery, Russia |
Detail Design documentation, equipment delivery & erection & commissioning |
1 set Hydrogen 30.000 Nm3/h, set of various eguipment CS, Cr-Mo, Cr-Ni 3,1 MPa 650°C ASME |
|||
4/2019 12/2021 |
BorsodChem MCHZ, s.r.o., Ostrava - Mariánské Hory, Czech Rep. |
Benzene Adiabatic nitration line S/001/15 |
Detail Design documentation, equipment delivery & erection & commissioning |
1 set 120 000 metrických tun MNB Operation unit overal dimensions 36x30x35m CS, SS ČSN EN |
|||
8/2019 12/2019 |
Unipetrol výzkumně vzdělávací centrum, a.s., UniCRE, Ústí nad Labem, Czech Rep. |
Hydrocracking test unit |
Implementation documentation, equipment delivery & erection & commissioning |
1 set Simulation of a two-stage hydrocracking process and research into the influence of conditions, raw materials and catalyst activity, etc. on the hydrocracking process. The experiments will take place in the short and long term, including long-term testing in the order of approximately weeks to 6-12 months. 3000x2000x4500 mm SS 30 Mpa 500°C ČSN EN |
|||
3/2020 3/2021 |
Synthesia, a.s. Semtín, Pardubice, Czech Rep. |
Modernization of the denitration column |
Detail Design documentation, equipment delivery & erection & commissioning |
1 set Nitric acid flow: 13 500 - 15 500 l/h DN1000x5400 mm SS 300kPa 80°C ČSN+PED |
|||
1/2021 10/2021 |
Synthesia, a.s. Semtín, Pardubice, Czech Rep. |
Modernization of the denitration columnOxidizer-Condenser Vessel |
Detail Design documentation, equipment delivery & erection & commissioning |
1 set, mat. SS, ČSN EN |