Ecology
Start End |
Client Country |
Subject | Scope of Work | Number of Pieces Size Pressure Temperature |
---|---|---|---|---|
06/2000 03/2001 |
FORTUM o.s. Pardubice Czech Republic |
Absorber, flue gas ducts – Flue gas desulphurization plant | Extended basic design | 1 line 4 boilers output 55 MW/boiler 2 boilers output 200 MW/ boiler Flue ducts 4800 x 8000, D 8000, Absorber D 13210 x H 29200 |
11/2000 05/2001 |
HA.EM Ostrava s.r.o. Ostrava Czech Republic |
Absorber – Flue gas desulphurization plant | Detail design, equipment delivery | 1 pc D 13 210 x H 29 200 mm Carbon steel, lining Alloy 59, AISI 317L and glass reinforced fiber |
02/2004 05/2004 |
ALFA SYSTÉM a.s. Praha Czech Republic |
Contaminated soil treatment | Design for Civil Approval | 1 line 7,500 kg/h treated soil |
12/2006 11/2007 |
PRAŽSKÉ VODOVODY A KANALIZACE a.s., Praha Czech Republic |
Biogas treatment –siloxane removal upwards cogeneration unit | Detail design, equipment delivery, start-up, commissioning |
1 unit 4 000 m3/h biogas 8 000 Pa 60°C |